Milestone

1975:

Incorporated as Balrampur Chini Mills Limited by taking over the operations of the erstwhile sugar factory of Balrampur Sugar Company Limited in East Uttar Pradesh.

1990:

Acquired Babhnan Sugar Mills Limited with a capacity of 1,000 TCD.

1995:

Diversified into distillery operations at the Balrampur unit through the commissioning of a 60 klpd distillery.

1998:

Acquired Tulsipur Sugar Company Limited with a capacity of 2,500 TCD.

2003:

Ventured into a 19.55 MW bagasse-based power generation unit at the Balrampur facility.

Set up an integrated greenfield sugar complex at Haidergarh in East Uttar Pradesh with a sugarcane crushing capacity of 4,000 TCD and co-generation capacity of 20.25 MW.

2004:

Set up distillery operations at the Babhnan unit, with a capacity of 60 klpd.

2005:

Acquired the Rauzagaon unit from The Dhampur Sugar Mills with a sugarcane crushing capacity of 7,500 TCD and co-generation capacity of 12 MW.

Established an integrated greenfield sugar complex at Akbarpur in East Uttar Pradesh with a sugarcane crushing capacity of 7,000 TCD and co-generation capacity of 18 MW.

2006:

Set up an integrated greenfield sugar complex at Mankapur in East Uttar Pradesh with a sugarcane crushing capacity of 8,000 TCD and co-generation capacity of 34 MW.

Taken over the management of Maizapur Chini Mills a unit of Balrampur Chini Mills Limited.

2007:

Set up integrated Greenfield sugar complex at Kumbhi in Central UP with sugarcane crushing capacity of 8000 TCD and cogeneration capacity of 20 MW.

2008:

Set up integrated Greenfield sugar complex at Gularia in Central UP with sugarcane crushing capacity of 8000 TCD and cogeneration capacity of 31.3 MW.